Prepare the Surface

Clean the surface thoroughly by removing dust, dirt, loose debris, and any oil or grease.

Use a wire brush or water to remove any moss, algae, or weak material.

Fill Cracks and Gaps

Repair cracks, holes, or dents using a cement-sand mixture (1:3 ratio) or a ready-mix patching compound.

For larger gaps, use a cement slurry to ensure proper bonding.

Apply the Base Layer / Primer

Ensure the surface is properly cured and dampened slightly before application.

Apply a thin coat of cement slurry or bonding agent to enhance adhesion of the top layer.

Apply the Top Layer

Mix cement with sand and water in the recommended ratio (usually 1:3 or 1:2 depending on the application).

Apply 2–3 coats of the mixture, leveling and smoothing each layer for uniformity.

Curing / Drying

Keep the cement surface moist for 7–14 days to ensure proper curing and strength.

Avoid direct exposure to harsh sunlight or rain during the first few days.

Maintenance Guidelines

Inspect the surface regularly for cracks or damages.

Clean the surface to remove algae, moss, or dirt buildup.

Apply a protective coating or waterproofing layer if required for added durability.

Search For Products

Product has been added to your cart
Compare (0)